MIL-STD-1168C
c. The manufacturing activity or sustainment activity should ensure that they are using the proper manufacturer's identification symbol at all times. Additionally, it is their responsibility to inform the PQM if under a contract,
or the applicable QASAS or Chief Inspector for sustainment actions, if any of the conditions have been met which could require the assignment of a new manufacturer's identification symbol (see 4.2.4).
d. For manufacturing activities, the PQM should ensure that the activity is assigned a symbol from JMC prior to the start of production and should verify that the activity uses the correct manufacturer's identification symbol at all times.
e. For sustainment activities, the responsible functional specialist who issues instructions and directives for reworks, maintenance, modifications, etc. should also be responsible for ensuring that a manufacturer's identification symbol is assigned prior to starting work on actions that require the establishment of a new lot number, such as regrouping or blending. The responsible functional specialist should also verify that each installation performing such operations uses the correct manufacturer's identification symbol at all times.
6.9 Year and month of production responsibilities. In conjunction with the requirements outlined in sections 4 and 5, the following responsibility references are provided and recommended.
a. The manufacturing activity is responsible for the correct application and placement of the year of production code and the month of production code into the lot number (see 4.3).
b. When sustainment activities perform actions that require the establishment of a new lot number, such as regrouping or blending, then they are responsible for the proper application of the month and year of production (see 4.3).
6.10 Interfix management responsibilities. In conjunction with the requirements outlined in sections 4 and 5, the following responsibility references are provided and recommended.
a. The manufacturing activity or sustainment activity is directly responsible for the assignment of interfix numbers or blocks of interfix and for making changes, as required in accordance with this standard (see 4.4). They have the primary responsibility to ensure that interfix numbers are correct and used properly at all times. They also have the responsibility to ensure that all interfix changes are properly documented on the ADCs.
b. The applicable Government functional specialist is responsible for verifying the correctness and proper use of the interfix numbers. They are also